U-Tapao International Airport Passenger Terminal - Phase1
Rayong, Thailand
Highly anticipated U-Tapao International airport is the quintessential piece of Architecture that crowns the vast land development to solidify the aviation expansion for the EEC, Thailand 4.0.
CLIENT:
UTA ( U-Tapao Airport Group)
TYPE:
Aviation,Transportation & Technology
SERVICE:
Executive Architect & Interiors Consultancy (2021)
SIZE:
(Terminal - Phase1) 179,000 sq.m.
EEC ASIAN AVIATION HUB:
U-Tapao International Airport Expansion
Engineering Thailand’s Third International Gateway: High-Capacity Aviation Infrastructure for the EEC.
Discover the architectural and master-planning scope of the U-Tapao International Airport expansion, a 6,500-rai aviation hub engineered to handle up to 60 million passengers annually with dual runways and expanded apron capacity.
• Location: Ban Chang, Rayong (Eastern Economic Corridor - EEC)
• Total Site Area: 6,500 Rai (approx. 1,040 Hectares)
• Runway Infrastructure: Dual Parallel Runways — Existing Runway 1 (3,500 m. × 60 m.) and New Runway 2 (3,505 m. × 60 m.)
• Aircraft Parking Bays: Expanding from 52 existing bays to over 120 contact and remote stands (Code E & Code F capable)
• Ultimate Passenger Capacity: Phased expansion from 3 million to 60 million passengers per year
Design Concept & Vision
Positioned as Bangkok’s third major international airport and a core aviation hub for ASEAN, the U-Tapao International Airport project prioritizes high-throughput airside efficiency, operational resilience, and passenger comfort. The architectural concept merges tropical sustainability with smart biometric aviation systems, ensuring rapid aircraft turnaround and intuitive passenger flow. Complementing the core airport infrastructure, a compact, integrated Eastern Airport City zone sits directly landside to support transit hospitality, commercial retail, and regional connectivity.
Aviation Infrastructure & Program Highlights
Master-planned across 6,500 rai, the development focuses heavily on expanding airside and terminal capabilities across multiple construction phases:
• New International Passenger Terminal (Terminal 3): Spanning over 157,000 sq.m. in its initial expansion phase and scaling up to over 450,000 sq.m. at full build-out, featuring natural daylighting, automated baggage handling, and One-ID biometric processing.
• Dual-Runway & Taxiway Network: Combines the upgraded 3,500-meter runway with a newly constructed 3,505-meter second runway, rapid-exit taxiways, and a new Air Traffic Control (ATC) tower to support simultaneous, high-frequency wide-body operations.
• Expanded Apron & 120+ Aircraft Bays: Reconfigures and expands the existing 52-bay apron into a comprehensive network of over 120 contact gates and remote stands capable of accommodating next-generation wide-body aircraft.
• Integrated Cargo, MRO & Transit Hub: Incorporates a dedicated air cargo village, a Free Trade Zone, a Maintenance, Repair, and Overhaul (MRO) complex, and a direct underground High-Speed Rail station linking U-Tapao with Suvarnabhumi and Don Mueang airports.
Engineering Thailand’s Third International Gateway: High-Capacity Aviation Infrastructure for the EEC.
Discover the architectural and master-planning scope of the U-Tapao International Airport expansion, a 6,500-rai aviation hub engineered to handle up to 60 million passengers annually with dual runways and expanded apron capacity.
• Location: Ban Chang, Rayong (Eastern Economic Corridor - EEC)
• Total Site Area: 6,500 Rai (approx. 1,040 Hectares)
• Runway Infrastructure: Dual Parallel Runways — Existing Runway 1 (3,500 m. × 60 m.) and New Runway 2 (3,505 m. × 60 m.)
• Aircraft Parking Bays: Expanding from 52 existing bays to over 120 contact and remote stands (Code E & Code F capable)
• Ultimate Passenger Capacity: Phased expansion from 3 million to 60 million passengers per year
Design Concept & Vision
Positioned as Bangkok’s third major international airport and a core aviation hub for ASEAN, the U-Tapao International Airport project prioritizes high-throughput airside efficiency, operational resilience, and passenger comfort. The architectural concept merges tropical sustainability with smart biometric aviation systems, ensuring rapid aircraft turnaround and intuitive passenger flow. Complementing the core airport infrastructure, a compact, integrated Eastern Airport City zone sits directly landside to support transit hospitality, commercial retail, and regional connectivity.
Aviation Infrastructure & Program Highlights
Master-planned across 6,500 rai, the development focuses heavily on expanding airside and terminal capabilities across multiple construction phases:
• New International Passenger Terminal (Terminal 3): Spanning over 157,000 sq.m. in its initial expansion phase and scaling up to over 450,000 sq.m. at full build-out, featuring natural daylighting, automated baggage handling, and One-ID biometric processing.
• Dual-Runway & Taxiway Network: Combines the upgraded 3,500-meter runway with a newly constructed 3,505-meter second runway, rapid-exit taxiways, and a new Air Traffic Control (ATC) tower to support simultaneous, high-frequency wide-body operations.
• Expanded Apron & 120+ Aircraft Bays: Reconfigures and expands the existing 52-bay apron into a comprehensive network of over 120 contact gates and remote stands capable of accommodating next-generation wide-body aircraft.
• Integrated Cargo, MRO & Transit Hub: Incorporates a dedicated air cargo village, a Free Trade Zone, a Maintenance, Repair, and Overhaul (MRO) complex, and a direct underground High-Speed Rail station linking U-Tapao with Suvarnabhumi and Don Mueang airports.